以海南汉能光伏有限公司一期250MW薄膜太阳能电池生产项目主厂房屋面工程为例,根据工程的特点及现场的实际情况,重点阐述了该厂房钢屋面系统经过深化设计,采用了超长无脊大波屋面瓦施工技术,结果表明,该技术的采用,不但施工进度有了明显提高,而且屋面的防雨、排水效果得到了有效保障。
Taking the main workshop project of 250MW thin film solar cell production project of Hanneng Photovohaic Co. , as an example, according to the actual situation and characteristics, it is indicated that through detailed design, the construction of super long and no ridge large corrugated tile is used. The application shows that, by using this technology, not only the construction progress has been significantly improved, but the roof waterproof, drainage has gotten effective protection.