摘要 针对制造车间重调度触发机制问题,建立了制造车间重调度损益函数,揭示了生产车间重调度过程损失及增益的变化规律.引入云理论测度重调度损益的不确定性,使用逆向云算法计算重调度增益云和损失云的数字特征,根据云形态预测重调度损益变化趋势.提出一种基于损益云模型的重调度决策方法以判断是否需要重调度,并利用最佳损益比甄选预调度方案以兼顾生产系统的稳定性和有效性.最后,通过实例验证了该方法的合理性和实用性. Aiming at the problem of rescheduling triggering mechanism in manufacturing shops, the rescheduling gain and loss functions are established to reveal the law of tradeoff between profit and cost during the rescheduling process. The cloud theory is applied to measure the uncertainty of rescheduling tradeoff. Then the reverse cloud algorithm is used to calculate the numerical characteristics of gain and loss cloud. Furthermore, the cloud shape is used to predict the tendency of rescheduling tradeoff. A decision method based on the gain-loss cloud model is proposed to determine whether or not reschedule, and the pre-schedule that ensures the stability and efficiency of production system can be selected by using the optimal gain-loss ratio. Finally, an example is given to demonstrate the rationality and feasibility of the method.
出处 《控制与决策》 EI CSCD 北大核心 2014年第8期1458-1464,共7页 Control and Decision
基金 国家重点基础研究发展计划项目(2011CB013406) 国家自然科学基金面上项目(71071046)
关键词 重调度驱动机制 云理论 损益云模型 损益比 rescheduling driven mechanism cloud theory gain-loss cloud model gain-loss ratio
  • 相关文献

参考文献17

  • 1Vieira G E,Herrmann J W,Lin E.Rescheduling manufacturing systems:A framework of strategies,policies,and methods[J].J of Scheduling,2003,6(1):39-62.
  • 2李莉,乔非,许潇红,吴启迪.半导体生产线全局修正式重调度方法研究[J].计算机集成制造系统,2006,12(7):1022-1027. 被引量:4
  • 3乔非,李莉,王遵彤,过纯中.面向半导体生产的改进的混合重调度策略研究[J].计算机集成制造系统,2007,13(3):558-562. 被引量:4
  • 4张洁,翟文彬,严隽琪,马登哲.基于模糊神经网络的半导体生产线重调度策略优化[J].机械工程学报,2005,41(10):75-79. 被引量:6
  • 5Haruhiko S.A new when-to-schedule policy in online scheduling based on cumulative task delays[J].Int J of Production Economics,2007,110(1/2):175-186.
  • 6Ouelhadj D,Petrovic S.A survey of dynamic scheduling in manufacturing systems[J].J of Scheduling,2009,12(4):417-431.
  • 7Petrovic D,Duenas A.A fuzzy logic based production scheduling/rescheduling in the presence of uncertain disruptions[J].Fuzzy Sets and Systems,2006,157(16):2273-2285.
  • 8刘琳,谷寒雨,席裕庚.工件到达时间未知的动态车间滚动重调度[J].机械工程学报,2008,44(5):68-75. 被引量:17
  • 9Qiao F,Wu Q D,Li L,et al.A fuzzy Petri net-based reasoning method for rescheduling[J].Trans of the Institute of Measurement and Control,2011,33(3/4):435-455.
  • 10Snoo C de,Wezel W V,Wortmann J C,et al.Coordination activities of human planners during rescheduling:Case analysis and event handling procedure[J].Int J of Production Research,2011,49(7):2101-2122.

二级参考文献74

共引文献536

同被引文献61

引证文献5

二级引证文献44

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部