摘要
简要介绍了吴家庄水库的工程概况,对该水库枢纽工程施工组织设计方案进行了研究,主要从施工导流、工程施工、工程布置以及工程进度等几个方面作了论述,为工程的顺利施工提供了依据。
The paper briefly introduces Wujiazhuang reservoir engineering conditions,studies the construction organization design scheme of the reservoir hub engineering,and discusses construction diversion,engineering construction,engineering distribution and engineering schedule and other aspects,which has provided some guidance for engineering construction smooth.