Feasibility of Wind Power Generation for the Reduction of Power Costs in Residential Buildings
Feasibility of Wind Power Generation for the Reduction of Power Costs in Residential Buildings
摘要
The installation of wind power generators on buildings located in areas with regular winds may be a suitable investment in a renewable power source. Brazil has a high eolic potential, where the annual mean wind speed may reach over eight meters per second. This case study is aimed to assess the economic feasibility of the installation of small wind power plants in urban areas. This work evaluates a project for the installation of a vertical axis wind turbine in three buildings (15-, 22-, and 26-story) including the following stages: (1) installation of a real-time power meter in the 15-store unit; (2) demand analysis of the 26-store building's power consumption; (3) winds survey along the coast of the State of Ceara; (4) analysis of the wind turbines available in the market; (5) simulation aimed to choose the system. Vertical wind power generators offer better conditions of use in urban areas. The turnover time was established to be between four and six years in the three studied units. The installation of a wind power generator on buildings in regions with an adequate eolic regimen reaches a financial return of the investment before the end of the equipment's lifespan.
参考文献7
-
1Greenspec Building Design. 2014. "Domestic Scale Wind Turbines 1-6 kW." Greenspec. Acessed January 28, 2014. http://www.greenspec.co.uk/building-design/small-wind-t urbines/.
-
2Callado, R. M. 2009. Viabilidade da utilizacao de geradores eolicos na redugao do custo de energia em condominios prediais, Fortaleza. Graduation Work (Eletronic Engineerig Program)--UNIFOR.
-
3Mertens, S. 2002. "Wind Energy in Urban Areas: Concentrator Effects for Wind Turbines Close to Buildings." Refocus 3 (Mar.-Apr.): 22-4.
-
4SEINFRA. 2010. "Cearas Government's infrastructure secretary (Wind Enertgy Resource Atlas of state of Ceara)." Camargo Schubert Eolic Engineering. Acessed January 28, 2014. http://www.seinfra.ce.gov.br/index.php/downloads/catego ry/6-energia?download= 16%3Aatlas-do-potencial-eolico- do-ceara..
-
5Rocha, N. A., Schultz, D. J., Amarante, O. C., Sugai, M. V. B., and Bittencourt, R. M. 2001. "Wind/Hydro Complementary Seasonal Regimes in Brazil." Nr: DEW1 Magazin 19: 79-86. Acessed January 28, 2014. http://www.dewi, de/dewi/fileadmin/pd f/publications/Mag azin_19/13.pdf.
-
6Greenmaster Energy Technology (Shanghai) Co. Ltd. 2009. "Revolutional V--Series wind turbine for the Built-up Enveronment with Turbulence. Vertical axis wind turbine-Wind turbine." Windmaster. Acessed January 13, 2014. http ://www.greenmasterinc.com/index/mc/vawt.htm.
-
7Yueqing Kino Electrics Co., Ltd. 2013. Wind turbine VAWT. Acessed January 23, 2014. http://kino.en.gongchang.com/product/3210269.
-
1陈波.备用水泵自动投入装置电路图的改进[J].电世界,1998,39(9):19-19.
-
2武文.关于对县级调度自动化系统建设的探讨[J].中小企业管理与科技,2011(36):320-320.
-
3国网上海市电力公司 城市地区分布式电源并网运行技术研究与平台建设[J].华东科技,2015(12):61-61.
-
4王晓明.谈如何控制建筑安装的质量问题[J].中国科技博览,2011(29):579-579.
-
5肖毅雄,廖达秀.华能文昌风电厂(一期)工程成功并网[J].珠江现代建设,2009(1):35-35.
-
6去年全国110千伏及以下电网投资近2070亿[J].供电企业管理,2013(2):77-77.
-
7吴正波.影响城市地区配电系统供电可靠性常见原因分析[J].科技信息,2007(25):257-258.
-
8四水归堂[J].百年建筑,2007(11):138-141.
-
9胡耀方,梁德敏,简永贤,罗永润.城市地区配电网规划中的负荷分析与预测研究[J].机电工程技术,2017,46(1):59-61. 被引量:1
-
10秦栗.10kV供配电系统的技术管理[J].农村电气化,2013(10):61-61.