松散堆积体塌方带穿越施工技术研究 被引量:2

Discussion about Construction Technology Passing Through Collapse Belt from Loose Deposits
下载PDF
导出
摘要 在隧洞开挖过程中因地质原因、开挖工艺和支护参数不当,经常会出现塌方,如何快速成功处理塌方并预防易失稳洞段再次发生塌方直接影响隧洞开挖的进度、工程的造价和施工安全.以浙江LNG项目配套供水工程中宅岭隧道BK0+946~BK0+986段松散堆积体塌方带穿越施工为例,介绍了松散堆积体塌方带的穿越施工技术和预防易失稳洞段再次发生塌方的技术措施. Collapse frequently occur in tunnel excavating because of geological cause, digging technique and improper support pa- rameter, so how to quickly successfully deal with collapse and pre- vent collapse occurring again in unstable tunnel section would di- rectly impact the rate of cutting progress, project cost and safety of construction. Taking the construction passing through collapse belt from loose deposits in BK0+946-BK0+986 section of Zailing tunnel in a water supply project of form a complete set of Zhejiang LNG project as an instance, the paper introduced the cutting technology across collapse belt from loose deposits and the technical measures to prevent unstable tunnel section from collapse again.
作者 陈水和
出处 《西部探矿工程》 CAS 2014年第8期194-198,共5页 West-China Exploration Engineering
关键词 松散堆积体塌方带 穿越施工 预防易失稳洞 collapse belt from loose deposits crossing construc-tion technical measures to prevent unstable tunnel section fromcollapse again
  • 相关文献

参考文献6

二级参考文献6

  • 1JTGD70-2004.公路隧道设计规范[S].[S].,..
  • 2TJT042-1994,公路隧道施工技术规范[S].
  • 3JTJ064-1998,公路地质勘察规范[S].
  • 4梁炯.锚固与注浆技术手册[K].北京:中国电力出版社,2002.
  • 5安徽省公路勘察设计院六安至岳西段高速公路康皮畈2号隧道两阶段设计施工图[Z].合肥:2005.
  • 6吴焕通,崔永军.隧道施工及组织管理指南[M].北京:人民交通出版社,2006.

共引文献6

同被引文献13

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部