某工程冲孔灌注桩静载不合格问题的分析及处理 被引量:1

Analysis and Treatment of the Unqualified Punch Cast- in- situ Pile on Static Loading Test
下载PDF
导出
摘要 某工程原设计基础为冲孔灌注桩,但桩基施工后静载试验的单桩承载力特征值仅为设计单桩承载力特征值的50%~60%,通过对地勘资料和现场施工记录的分析,提出了几种不同的基础加强方案进行比选,最终采用增设PHC管桩进行地基处理的天然筏板基础方案,通过后期的沉降观测与土压力、桩顶反力监测证明该方案实施效果良好,对类似工程具有一定的参考意义。 The original design of one engineering project was based on punch cast - in - situ pile, but the actual characteristic value of single pile bearing ca- pacity accounted for only 50% -60% of the desired value on static loading test after pile foundation construction. Comparing with several different schemes proposed for foundation strengthen by geological survey report and site construction record, the feasible scheme was add several PHC pipe piles as natural raft foundation for ground treatment, which showed good effect and also had some reference value to similar engineering projects by later settlement observation and measurement of earth pressure & reaction force at pile top.
作者 郑增旭
出处 《福建建筑》 2014年第7期98-101,共4页 Fujian Architecture & Construction
关键词 冲孔灌注桩 静载试验 单桩承载力特征值 PHC管桩 地基处理 沉降观测 Punch cast - in - situ pile Static loading test Characterisitic value of the vertical bearing capacity of a single pile PHC pipe pile Ground treat- ment Settlement observation
  • 相关文献

参考文献6

  • 1宰金珉.塑性支承桩——卸荷减沉桩的概念及其工程应用[J].岩土工程学报,2001,23(3):273-278. 被引量:80
  • 2JGJ 94-2008,建筑桩基技术规范[S].
  • 3JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 4GB50007-2002.建筑地基基础设计规范[S].[S].,..
  • 5DBJ13-86-2007先张法预应力混凝土管桩基础技术规程[S].
  • 6某工程10#楼监测报表[Z].厦门辉固工程技术有限公司,2012.08-2013.11.

二级参考文献5

共引文献3957

同被引文献3

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部