摘要
针对升级改造中使用荷载增加较大的重力式码头结构稳定性、承载力不能满足规范要求的情况,提出码头墙后增设桩基及简支板平台、形成卸荷平台减少土压力的方案,计算分析表明,卸荷平台对提高结构稳定性、承载力和减少地基应力有显著作用。探讨其优缺点和适应性。
For the case that the gravity wharf has large load increasing after the upgrading and rebuilding, the structure stability and the bearing capacity can t meet the specification requirements. The method of adding e stability and bearing capacity of the structure and reducing the foundation stress. The advantages and disadvantages and adaptability of this structure are studied after.
出处
《水运工程》
北大核心
2014年第7期69-72,共4页
Port & Waterway Engineering
关键词
重力式码头
升级改造
卸荷平台
应用
gravity wharf
upgrading and rebuilding
unloading platform
application