期刊文献+

新型系留方式在突堤式浮码头工程中的应用 被引量:1

Application of new-type pontoon-mooring on pier of floating-wharves
下载PDF
导出
摘要 洋山深水港区工程工作船避风港池浮码头建设采用突堤式布置形式,传统的系留方式不能满足其要求。本文创新地提出3根直桩定位趸船的系留方式,陆侧采用2根1 200 mm钢管桩,海侧采用1根1 500 mm钢管桩构成稳定的支撑体系,使码头荷载均匀分配,结构受力明确。趸船抱桩装置上设置可拆卸挡板,便于港池疏浚施工或趸船维修时移出趸船。 The pier of floating-wharf is used in refuge harbor basin for work-boat of Yangshan deepwater port, and traditional barge-mooring can not meet its operation requirements. A new-type pontoon-mooring is creatively advanced: two φ1 200 mm steel-pipes in landside and one φ1 500 mm steel-pipe in seaside to constitute a stable support-system, in which, loads are evenly flapper is installed to help the pontoon remove for distributed and the structure stress is definite. The removable- dredging or maintenance
出处 《水运工程》 北大核心 2014年第7期73-76,共4页 Port & Waterway Engineering
关键词 浮码头 突堤式 趸船系留 3根直桩定位 可拆卸挡板 floating wharf pier pontoon-mooring three-pipe allocation removable-flapper
  • 相关文献

参考文献6

  • 1中交第三航务工程勘察设计院有限公司.上海国际航运中心洋山深水港区工作船港池专题研究报告[R].上海:中交第三航务工程勘察设计院有限公司,2007.
  • 2JTS144-1-2010港口工程荷载规范[S].
  • 3JTJ294-1998斜坡码头及浮码头设计与施工规范[S].
  • 4刘世海.混凝土定位墩在浮码头上的应用[J].工程与建设,2008,22(3):348-349. 被引量:3
  • 5JTS167-4-2012.港口工程桩基规范[S].
  • 6赵今生.港口工程[M].北京:人民交通出版社,1979.