摘要
3#高炉首次在达钢集团实施空料线到风口后放残铁工作,经过炼铁厂相关技术人员的精心操作和控制,空料线到风口后从残铁口放出残铁110余吨,达到了成功停炉目的。
No. 3 blast furnace has the first implementation of lowering the stockline to the vent to release the residual iron in Dagang's history. Through the careful operation and control of rele- vant technical staff of ironworks, 110 tons of residual iron was released when the stockline was lowering to the vent to reach the shutdown purposes.
出处
《四川冶金》
CAS
2014年第4期20-23,共4页
Sichuan Metallurgy
关键词
高炉
空料线
放残铁
停炉
生产实践
blast furnace
lowered stock line
release remainder iron
blowing down
production practice