摘要
分析了某问题尾矿库坝体存在管涌的现状,为防止出现由于未按照设计方案,就进行坝体大规模改造,从而造成跑库等相关的灾害,在保证坝体完整性的前提下,通过采取坝坡内侧设置反滤层,底部设置排渗盲沟的措施,解决了尾矿坝渗水的实际问题保证了该库的安全生产。
Analyzes the current situation of existing piping of a problematic tailing dam. For preventing because of not in accordance with the design scheme extensively transform dam body, thus cause dam break and related to dis- asters. Under the premise of ensuring dam body integrity, by setti french drain at the bottom of dam slope and other measures, solves sures the safe production of the tailing pond ng the filter layer at the inside of dam slope, setting practical problems of tailing dam seeping, en-
出处
《山西焦煤科技》
2014年第6期54-56,共3页
Shanxi Coking Coal Science & Technology
关键词
尾矿库
管涌
反滤层
排渗盲沟
Tailing pond
Piping
Inverted filter
French drain