期刊文献+

用响应比波速比监测预测瀑布沟水库诱发地震 被引量:2

The Application of Load-unload Response Ratio and Wave Velocity Ratio in Monitoring and Forecasting Earthquakes Induced by the Pubugou Reservoir
下载PDF
导出
摘要 介绍对瀑布沟水库用加卸载响应比和波速比监测预测水库诱发地震的实践过程,通过课题以往的预测和对应其后期实际发生的地震来分析,结果显示:地震频度库水加卸载响应比Yn和Cr值、库水下方地震波速比这两种方法都可以作为监测预测水库诱发地震的新方法。 The paper described the application of load-unload response ratio and wave velocity ratio in monitoring and forecasting earthquakes induced by the Pubugou reservoir. From the previous forecasts and the corresponding earthquakes that actually occurred, the paper did analysis. The results show that frequency of earthquakes and load-unload response ratios(Ynand Cr)and wave velocity ratios under a reservoir can both be used as new methods to monitor and forecast induced reservoir earthquakes.
作者 胡先明 杜瑶
机构地区 四川省地震局
出处 《华南地震》 2014年第2期11-18,共8页 South China Journal of Seismology
基金 国家科技支撑计划项目"汶川地震断裂带科学钻探"专题"断裂带深部流体观测及其与余震活动关系研究"(WFSD-10-03)资助 中国地震局地震科技星火计划项目-瀑布沟水库库区震源物理与诱发地震研究(XH-1022)资助
关键词 水库诱发地震 波速比 瀑布沟水库 加卸载响应比 Induced reservoir earthquake Wave velocity ratio Pubugou ReservoirLoad-unload response ratio
  • 相关文献

参考文献19

二级参考文献123

共引文献304

同被引文献26

引证文献2

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部