期刊文献+

两级信用期下资金受限生产商的贷款融资决策模型

Study on Manufacturer Loaning Decision Model with Fund Constraint under Two-stage Credit Terms
下载PDF
导出
摘要 在由资金受限的生产商、零售商和消费者组成的三级供应链中,通过讨论供应商是否进行银行贷款融资,构建了允许延迟交货和缺货下的两级信用期库存成本模型。根据生产商的生产时间、零售商的订货周期和信用期之间的对比,构建了三种不同情形下的供应链总成本模型。然后,以命题的形式对供应商在不同情形下银行融资的必要条件进行了求解。最后,通过相关参数的灵敏度分析得到:资金受限的供应商进行银行融资时能降低供应链成本;生产商采用精益生产可以明显降低供应链成本;在生产商延迟交货的情况下,零售商会选择小批量、多批次的订货策略。 In this paper, in view of a three-echelon supply chain composed of fund-constrained manufacturers, retailers and consumers,through discussing whether the suppliers should solicit bank loans, we built a two- stage credit term inventory cost model that allowed delivery postponement and stock shortage, studied the total cost model of the supply chain under three scenarios, then in the form of a proposition, examined the necessary conditions for the bank loaning activities of the suppliers under different situations, and at the end,determined the strategies of the suppliers, manufacturers and retailers under fund constraint and delivery postponement.
出处 《物流技术》 北大核心 2014年第7期120-125,共6页 Logistics Technology
关键词 资金受限生产商 两级信用 银行贷款融资 fund-constrained manufacturer two-stage credit bank loaning
  • 相关文献

参考文献17

  • 1Archibald T W,Thomas L C,Betts J M,Johnston R B.Should start-up companies be cautious? Inventory policies which maximize survival probabilities[J].Management Science,2002,48(9):l 161-1 174.
  • 2Sullivan T A,Warren E,Westbrook J.Financial Difficuhies of Small Businesses and Reasons for Their Failure[Z]. 1998.
  • 3Huang Y F.Optimal retailer's replenishment decisions in the EPQ model under two levels of trade credit policy[J].European Journal of Operational Research,2007,176(1):1 577-1 591.
  • 4Chung Kun-Jen,Huang Tien-Shou.The optimal retailer's ordering pol- icies for deteriorating items with limited storage capacity under trade credit financing[J].International Journal of Production Economics,2007, 106(1):127-145.
  • 5Hsieh Tsu-Pang, Dye Chung-Yuan,Ouyang Liang yuh.Determining op- timal lot size for a two-warehouse system with deterioration and short- ages using net present value[J].European Journal of Operational Re- search,2008,191 (1):182-192.
  • 6Teng Jinn-Tsair, Chang Chun-Tao.Optimal manufacturer's replenishment policies in the EPQ model under two levels of trade credit policy[J].Euro- pean Journal of Operational Research,2009,195(2)358-363.
  • 7Sana S Sankar.Optimal selling price and lot size with time varying de- terioration and partial backlogging[J].Applied Mathematics and Comp-utation,2010,217(1 ): 185-194.
  • 8Reza Maihami,Isa Nakhai Kamal Abadi.Joint control of inventory and its pricing for non-instantaneously deteriorating items under permissi- ble delay in payments and partial back- logging[J].Mathematical and Computer Modeiing, 2012,55(5-6):1 722-1 733.
  • 9Leop01do Eduardo Cardenas-Bah'on.The derivation of EOQ/EPQ in- ventory models with two backorders costs using analytic geometry and algebra[J].Applied Mathematical Modelling,2011,35(5):2 394-2 407.
  • 10Ali Arkan,Seyed Reza Hejazi.Coordinating orders in a two echelon supply chain with controllable lead time and ordering cost using the credit period[J].Computers&Industrial Engineering,2011,62(1):56-69.

二级参考文献21

  • 1简志宏,李楚霖.柔性产品组合最优切换的实物期权方法研究[J].管理科学学报,2006,9(1):14-19. 被引量:4
  • 2陈旭.考虑期权合同供应链的零售商订货研究[J].管理科学学报,2006,9(3):17-23. 被引量:33
  • 3陈祥锋,朱晨波.供应链采购管理中的期权合同价值研究[J].系统工程学报,2007,22(4):401-406. 被引量:32
  • 4Gavimeni S, Kapuscinsk R, Tayur S. Value of information in capacitated supply chains [ J]. Management Science, 1999, 45(1) : 16-24.
  • 5Lee H L, Billington C. Supply chain management: Pitfalls and opportunities [ J ]. Sloan Management Review, 1992, 33 (Spring) : 65-73.
  • 6Lee H L, Padmanabhan V, Whang S. Information distortion in a supply chain [ J ]. Operations Research, 1997, 43 (4) : 546-558.
  • 7Moinzadeh K, Aggarwal P K. An information based muhiechelon inventory system with emergency orders [ J ]. Operations Research, 1997, 45(5): 694-701.
  • 8Chen F. Echelon reorder points, installation reorder points, and the value of centralized demand information [ J ]. Manage ment Science, 1998, 44(12) : 221-234.
  • 9Cashon P G, Fisher M. Supply chain inventory management and the value of shared information[ J ]. Management Science, 2000, 46(8) : 1032-1048.
  • 10Cashon P G. Supply chain coordination with contracts [ A ]. Chapter 6 in the Handbooks in Operations Research and Management Science : Supply chain Management [ M ]. Elsevier: North-Holland, 2002.

共引文献192

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部