3[3]Leslie P. Steffe and Jerry Gale. Eds. (1995) Constructivism in Education. NJ.Lawrence Erlbaum Associates.
4[4]Lave,J.K&Wenger, E.(1991).Situated learning: Legitimate Peripheral Participation. New York: Cambridge University Press.
5[5]Erik De Corte and Franz E. Weinert. Eds. (1996). International Encyclopedia of Developmental and Instructional Psychology. Elsevier Science Ltd.
6[4]Arto K.Requirements management interface to building product models[D].Standford University,2005.
7[5]Edward H G.Is BIM the future for AEC design?[EB/OL],http://aec.cadalyst.com/aec/article/articleDetail.jsp?id=133495,2004-12-01.
8[6]Facilities Information Council.The united states national building information model standard[EB/OL].http://www.nibs.org/ficactivities.html,2006-7-02.
9[8]Bjork B C.Information technology in construction:domain definition and research[J].International Journal of Computer Integrated Design and Construction,1999(1):3-16.