摘要
抚顺石化烯烃厂开工运行生产期间,污水处理场2501单元对生产污水的COD的去除效果始终不理想。通过对污水处理场2501单元各流程COD去除情况的对比,着重介绍了水解酸化池的实际运行情况,并分别对其运行控制与影响因素进行了总结,指出了设计中存在的问题,并提出了进一步研究的方向。
Since Fushun Petrochemical company olefin plant started operation, removal rate of COD in 2501 unit of sewage treatment plant was not ideal. Through comparison of COD removal rates of different processes in 2501 unit of sewage treatment plant, the practical operation of hydrolysis acidification pool was mainly introduced. And its operation control and influencing factors were summarized, the problems existing in the design were pointed out, and the direction of further study was put forward.
出处
《当代化工》
CAS
2014年第7期1218-1220,1223,共4页
Contemporary Chemical Industry
关键词
水解酸化池
运行控制
影响因素
Hydrolysis acidification pool
Operation control
Influencing factors