水冲法沉桩工艺在黄骅港综合港区通用泊位中的应用 被引量:2

Application of Pile Jetting Technology in Huanghua Port Comprehensive Harbor General-purpose Berth
下载PDF
导出
摘要 黄骅港综合港区通用散杂货码头工程地质中存在粉细砂硬夹层,采用锤击法沉桩,穿透此硬层非常困难。在本工程试桩中采用了水冲法配合锤击的沉桩工艺取得成功。在码头承台桩基施工中采用内冲内排的工艺,边冲边打成功打设了2根桩。为斜桩采用水冲法沉桩取得了经验。水冲法沉桩工艺成本低,穿透硬砂层效果好,应用前景广阔。 Silty sand hard stratum exists under the site of Huanghua port comprehensive harbor general-purpose bulk & general-cargo terminal project, which is hard to be penetrated with piles driven by hammer. The trial pile was made successfully by using pile jetting combined with pile driver hammer. Two piles are jetted and driven successfully by using inner jetting and draining technologies in the construction of pile foundation of wharf platform, which provide references for the application of sloping pile jetting method. Pile jetting method will be applied widely due to its low cost and good effect for penetrating hard sand layer.
作者 刘培玉
出处 《港工技术》 2014年第4期66-68,共3页 Port Engineering Technology
关键词 粉细砂硬夹层 桩基施工 水冲沉桩 应用前景 silty sand hard layer pile foundation construction pile jetting application prospect
  • 相关文献

参考文献3

  • 1吴先孟.水冲沉桩施工工艺[M].
  • 2JTS 167-1-2010高桩码头设计与施工规范[S].
  • 3JTS167-4-2012.港口工程桩基规范[S].