盾构曲线段施工地表沉降监测与变形规律 被引量:4

Surface Subsidence Monitoring and Study on Deformation Laws in Shield Curve Tunnel Construction
下载PDF
导出
摘要 研究直径10.0 m的土压平衡式盾构机曲线段的施工地表沉降变形规律。以北京地铁某盾构区间曲率半径R=350 m和R=354 m两处曲线施工段为监测对象,以几何水准测量为监测方法,通过对监测数据的分析得到如下结论:沉降变形主要经历前期沉降、盾尾脱出后沉降、注浆隆起、稳定沉降、后期沉降5个阶段,最终变形值分布包络图近似呈偏正态分布,对称轴线偏于曲线内侧。 Deformation laws of the Ф10.0 meter EPB shield curve construction are studied. The radius of curvature R=350 m and R = 354 m in one metro tunnel in Beijing Subway are selected as the monitoring objects. The geometrical leveling is taken as the monitoring method. It could be known through the analysis of subsidence deformation data that the main settlement deformation undergoes 5 stages: pre-settlement, settlement after shield tail prolapsed, grouting uplift, stable settlement, and post-settlement. The envelope graph of ultimate settlement presents an approximate partial normal distribution; the symmetric axis is partial to the inner side of the curve.
出处 《都市快轨交通》 北大核心 2014年第4期85-89,共5页 Urban Rapid Rail Transit
关键词 城市轨道交通 盾构法 土压平衡式 沉降变形规律 urban rail transit shield method EPB deformation laws of settlement
  • 相关文献

参考文献5

二级参考文献26

共引文献150

同被引文献19

引证文献4

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部