基于LPS的精益建造项目计划管理和控制 被引量:9

The Lean Construction Program Management and Control Based on LPS
下载PDF
导出
摘要 阐述了精益建造的一个重要工具——最后计划者体系(LPS)的理论基础,分析了传统项目计划管理和控制的缺陷,探讨了改进的方法,并结合案例分析了LPS在工程项目计划管理和控制方面的优势。实证表明LPS的运用使得项目的工作流更加稳定,通过滚动性的前瞻性计划、周生产计划等的实施、PPC值的检验、滞后原因分析及反馈机制,大大提升了项目的生产效率及稳定性,达到了预期效果。 This paper elaborates the theoretical foundation of LPS,which is one of the important tools of the lean construction. It also analyzes the defect of traditional programs management and control,discusses the improved method and researches the advantages of LPS in project management and control through a case. The empirical evidence shows that the use of LPS making the workflow of the program more stable. It greatly enhances the production efficiency and stability and finally achieved the expected results by implementing the rolling forward plan and week production schedule,testing the outcome of PPC,analyzing the reason of the lag and the feedback mechanism.
作者 邓斌 叶青
出处 《施工技术》 CAS 北大核心 2014年第15期90-93,共4页 Construction Technology
基金 中央高校基本科研业务费专项资金资助项目(JB-ZR1162) 华侨大学高层次人才科研启动项目(12BS131)
关键词 项目管理 精益建造 计划管理 最后计划者体系 project management lean construction plan management last planner system(LPS)
  • 相关文献

参考文献2

二级参考文献22

  • 1莫捷如.精益思维理论在建筑工程管理中的应用[J].国外建材科技,2006,27(1):112-114. 被引量:8
  • 2黄如宝,杨贵.精益建设的基础理论与应用理论研究[J].建筑管理现代化,2006,20(3):9-12. 被引量:23
  • 3赵道致,庹磊桥.精益建筑重要工具——最后计划者技术研究[J].河北工程大学学报(社会科学版),2007,24(1):1-3. 被引量:13
  • 4Glenn Ballard.Gregory Howell,Introduction to Lean Construction:Work Structuring and Production Control[J].Lean Construction Institute Seminar,2006
  • 5Glenn Ballard."The Last Planner"[J].NORTHERN CALIFORNIA CONSTRUCTION INSTITUTE MONTEREY,CA APRIL 22-24,1994
  • 6Glenn Ballard.The Last Planner system of production control[D].Department of Civil Engineering,University of Birmingham,Birmingham,UK,May,2000
  • 7Gregory Howell and Lauri Koskela,Reforming Project Management:The Role of Lean Construction[J].Proc.8th Annual Conf.of the Int.Group for Lean Construction,IGLC-6,Brighton,UK,July 17 19,2000
  • 8Lauri Koskela andGregory Howell,The Underlying Theory of Project Management Is Obsolete[J].Proceedings of the PMI Research Conference,2002
  • 9Sven Bertelsen and Lauri Koskela,MANAGING THE THREE ASPECTS OF PRODUCTION IN CONSTRUCTION[J].Proceedings IGLC 10,Aug.2002,Gramado,Brazil
  • 10Glenn Ballard,Gregory Howell,An Update On Last Planner,Lean Construction Institute Seminar,2003

共引文献15

同被引文献55

  • 1刘北贤,向英豪.基于BIM技术的项目精益建造应用研究[J].四川建筑,2021,41(S01):199-201. 被引量:5
  • 2蒋书鸿,苏振民.精益建造:一种先进的建造体系[J].基建优化,2004,25(3):11-13. 被引量:36
  • 3GLENN B. The last planner system of production con- trol [ D ]. Birmingham : University of Birmingham ,2000.
  • 4GLENN B, GREGORY. Shielding production:an es-sential step in production control [ J ]. Journal of Con- struction Engineering and management, 1997,124( 1 ) : 11 - 17.
  • 5ABDULLAH O A, TZORTZOPOULOS F P, KO- SKELA L. Improving construction management prac- tice with the Last Planner System: a case study [ J ]. Engineering, Construction and Architectural Manage- ment,2014,21 ( 1 ) :51 -64.
  • 6GAO S, LOW S P. The last planner system in Chinag construction industry:a SWOT analysis on implementa- tion[ J ]. International Journal of Project Management, 2014,32(7) : 1260 - 1272.
  • 7NIETO - MOROTE A, RUZ - VILA F. Last planner control system applied to a chemical plant construction [ J]. Journal of Construction Engineering and Manage- ment ,2012,138 (2) :287 - 293.
  • 8SEONG K C. The relation between lean construction and performance in the Korean construction industry [ D]. Berkeley: University of California, 2011.
  • 9LINDHARD S, WANDAHL S. Exploration of correct LPS practices in scheduling of large, comple:% and constrained construction projects [ J ]. International Journal of Project Organisation and Management, 2015,7(1) :56 -71.
  • 10Koskela L. Application of the new production philosophy to con- struction [ J ] . Physics Letters B, 1972, 40 ( 2 ) : 181- 184.

引证文献9

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部