摘要
通过对某铁矿尾矿库采用废石筑坝工艺进行研究与探讨,得出解决大型细粒级尾矿堆存问题的方法,并对其后期堆存提出合理化建议。
Through the study and discussion about damming with waste rock technology of the tailings of a certain iron ore, the paper summarizes the solutions to the storing problem of large--scale fine particle tailings, and puts forward the rationalization proposal for storage in later period.
出处
《矿业工程》
CAS
2014年第4期54-57,共4页
Mining Engineering
关键词
尾矿坝
废石筑坝
排洪系统
渗透破坏
tailing dam
damming with waste rock
floodwaters draining--off system
seepage failure