针对某铀矿地浸采铀工艺钻孔施工特点,分析影响地浸采铀工艺钻孔施工质量的主要因素,根据工程监理质量控制的一般原理和技术方法,制定了钻孔施工监理的质量控制措施并予以实施。这些措施实施后,钻孔施工中关键工序的质量事故明显减少,钻孔施工质量达到预定的控制目标。
Based on the characters of drilling construction of an in situ leaching uranium mine, principal factors of influence of drilling construction quality were analyzed. According to the general principles of project supervision quality control and technical methods, drilling construction supervision of quality control measures was set up and put into operation as well. By taking these measures, quality accident was evidently reduced during key procedures of drilling construction operation and quality of drilling construction meets predicted control objective.