摘要
通过了解某尾矿库的工程地质条件,分析其渗漏原因,评价其现有的防治措施效果,并提出采用可渗透反应墙(PRB)进一步处理尾矿库渗漏水的思路,为尾矿库渗漏水的污染防治提供参考。
Based on understanding of the engineering geological conditions of a certain tailing pond,this article analyzes the causes of leakage and estimates the effects of existing control measures.It is proposed to apply permeable reactive barriers (PRB)in treatment of leakage of tailing pond,and it may provide a reference for leakage treatment of tailing pond.
出处
《矿产与地质》
2014年第2期246-248,252,共4页
Mineral Resources and Geology
基金
重大专项计划(桂科重1298002-7)
广西重点实验室建设项目(13-051-13)资助
关键词
尾矿库
渗漏
措施
tailing pond
leakage
measure