期刊文献+

具有多个维修区间的单机调度问题 被引量:2

Single-machine scheduling with rate-modify activities
下载PDF
导出
摘要 针对工件具有位置退化效应,机器具有多个维修区间的单机调度问题。工件的加工时间为位置相关的函数。每次机器维修后回到初始的水平。目标函数为总的提前费用,误工费用,共同交货期的窗时费用和开始时间费用。对于共同交货期分为包括维修区间和不包括维修区间两种情形进行讨论,采用线性规划建立指派问题的数学模型,并分别提出最优序列的一些最优性质和相应的多项式时间算法。 This paper deals with single-machine scheduling with rate-modify activities and position-dependent deteriorated job. The machine can be performed multiple rate-modify activities to change the processing times of the jobs scheduled after the activity. The objective is to find a common due window for all the jobs and a location of the rate-modifying activ-ities for each job to minimize the sum of earliness, tardiness and the cost and the starting time of common due window. The common due window is divided into two cases:in maintenance interval or out maintenance interval. Some properties of the optimal schedule are provided for the problem and present polynomial algorithms, respectively.
作者 张新功
出处 《计算机工程与应用》 CSCD 2014年第15期235-239,共5页 Computer Engineering and Applications
基金 重庆市教委技术研究项目(No.KJ120624) 重庆师范大学重点项目(No.11XLB027 No.2011XLZ05)
关键词 调度 单台机器 速率改变行为 共同交货期 scheduling single-machine rate-modify activities common due window
  • 相关文献

参考文献11

  • 1Lee C L, Leon V J.Machine scheduling with a rate-modi- fying activity[J].European Journal of Operational Research, 2001,128:119-128.
  • 2Lee C L,Lin C S.Single-machine scheduling with main- tenance and repair rate-modifying activities[J].European Journal of Operational Research, 2001,135 : 493-513.
  • 3Zhang A,He Y.Single machine scheduling problem with rate-modifying activities[J].Joumal of Zhejiang University, 2006,33(3) :272-275.
  • 4Zhao C L, Tang H Y, Cheng C D.Two-parallel machines scheduling with rate-modifying activities to minimize total completion fime[J].European Journal of Operational Research, 2009,198 : 354-357.
  • 5Mosheiov G, Oron D.Due-date assignment and mainte- nance activity scheduling problem[J].Mathematical and Computer Modelling, 2006,44 : 1053-1057.
  • 6Mosheiov G, Sarig A.Scheduling a maintenance activity and due-window assignment on a single machine[J].Com- puters and Industrial Engineering, 2009,36 : 2541-2545.
  • 7Lodree E J, Geiger C D.A note on the optimal sequence position for a rate-modifying activity under simple linear deterioration[J].European Journal of Operational Research,2010,201 : 644-648.
  • 8Yang S J,Yang D L.Minimizing the makespan on single- machine scheduling with aging effect and variable main- tenance activities[J].Omega, 2010,38 : 528-533.
  • 9Panwalkar S S, Smith M L, Seidmam A.Common due date assignment to minimize total penalty for the one machine scheduling problem[J].Operations Research, 1982, 30:391-399.
  • 10Yang S J,Yang D L,Cheng T C E.Single-machine due- window assignment and scheduling with job-dependent aging effect and deteriorating maintenance[J].Omega, 2010,38:528-533.

同被引文献18

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部