期刊文献+

试论电力安装调试工程施工阶段的成本控制 被引量:5

On the Cost Control of the Construction Stage of Electricity Installation and Debugging Engineering
下载PDF
导出
摘要 在市场经济体制不断创新和完善下,电力行业之间的市场竞争力越来越激烈。电力企业若想在激烈的竞争中站稳脚跟,就必须严格控制施工成本,以提高企业的综合竞争力。对于电力安装调试工程来讲,其施工阶段的成本主要包括了施工材料费、施工机械设备费、项目管理费、施工人员劳务费等,当然这些费用的直接影响因素就是电力安装调试工程的施工方案。笔者结合自身的工作经验,基于电力安装调试工程,对其施工阶段的成本进行有效控制。 With the continuous innovation and improvement of market economic system, the competition between electric power enterprises is more and more fierce. To gain a foothold in the competition, it is necessary for electric power enterprises to strictly control the construction cost, in order to improve their comprehensive competitiveness. For electricity installation and debugging engineering, the cost of construction stage mainly includes the cost of construction materials, construction machinery and equipment, project management, construction personnel labor and so on. Of course, the construction scheme is the direct influencing factor of these costs. Based on the author's own working experience, effective measures to control the cost of the construction stage of electric installation and debugging engineering are put forward.
作者 王馗
出处 《价值工程》 2014年第26期89-90,共2页 Value Engineering
关键词 电力安装调试工程 施工阶段 成本控制 electricity installation and debugging engineering construction stage cost control
  • 相关文献

参考文献3

二级参考文献3

  • 1冯华,漆文邦,何药,赖星宇.浅谈水电工程施工阶段的成本控制[J].四川水利,2011,(21):21-25.
  • 2王飞,曹庆奎,蔡炜华.施工项目管理中的成本控制分析[J].辽宁工程技术大学学报,2009,(06):59-61.
  • 3伍胜洪.浅谈水利水电工程施工阶段的成本控制[J].水利水电工程造价,2008,(08):35-38.

共引文献5

同被引文献5

引证文献5

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部