摘要
以摩洛哥塔—乌高速公路项目T梁预制为例,对于应力混凝土预制T梁施工各工序进行全面介绍。本工程通过推行"流水施工、程序管理",施工进度、质量以及经营指标受控。现场的过程控制措施和施工经验可供摩洛哥后续项目参考。
Taking T beam prefabrication of the Taza-Oujda highway project in Morocco as an example, this paper comprehensively introduces the various processes of the T beam prefabricated by stress concrete. The "flow construction, program management" is implemented, and the construction progress, quality and business indicators are controlled. The scene process control measures and construction experience can provide reference for subsequent projects in Morocco.
出处
《价值工程》
2014年第26期113-115,共3页
Value Engineering
关键词
摩洛哥高速公路
预制T梁
施工
Morocco highway
T beam prefabrication
construction