综采工作面过陷落柱采煤技术 被引量:3

Technology of Passing Collapse Column in Fully-mechanize Face
下载PDF
导出
摘要 根据朱家湾煤矿152101综采工作面实际情况,通过对陷落柱的资料分析,利用"H"型巷道布置方式避开陷落柱对综采工作面采煤作业的影响。针对综采工作面过陷落柱难题,提出快速推进技术,包括工作面支架末采安全技术、支架撤出安全技术、刮板输送机拆除安全技术和巷道贯通安全技术,保证了工作面连续推进,不仅有效降低了陷落柱对生产的影响,提高了煤炭资源回收率,为以后工作面过陷落柱提供了技术指导。 According to reality of full-mechanize face of 152101 in Zhujiawan coal mine, through analyzing the data of collapse column, using“H"type of roadway arrangement to avoid the impact of collapse column on fully-mechanized coal face mining operation. For fully-mechanized coal face collapse column problems, we put forward rapid advance technology, including working face support safety technology without working, safety technology of working face support withdraw, safety technologies of scraper conveyor demolishing and roadway expedite. Application of the safety technical measures ensure continuous coal mining, not only effectively reduce the impact of collapse column on the production and improve the recovery rate of coal resources, but also provides technical guidance for passing collapse column in fully-mechanized coal face in the future.
出处 《山东煤炭科技》 2014年第8期1-2,4,共3页 Shandong Coal Science and Technology
关键词 综采工作面 陷落柱 技术措施 安全高效 full-mechanize face collapse column technical measures safety and high efifciency
  • 相关文献

参考文献3

二级参考文献3

共引文献29

同被引文献19

引证文献3

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部