摘要
通过分析深圳地铁下穿107国道施工可能遇到的问题,介绍了盾构机安全顺利通过的合理掘进参数,总结出盾构法隧道下穿道路施工的关键技术措施,这些成功经验都可为日后深圳乃至其他城市类似工程提供参考和借鉴。
The paper analyzes the problem which will be encountered in the construction of Shenzhen subway beneath state road 107 and describes a reasonable tunneling parameter of the shield machine passing safely and smoothly, as well as sums up the key technology and measure of the shield method passing through the road. These successful experiences can provide to consult and reference for the Similar projects in others cities as well as the Shenzhen city in the future.
出处
《西部探矿工程》
CAS
2014年第9期176-179,共4页
West-China Exploration Engineering
关键词
深圳地铁
盾构施工
国道
沉降超限
掘进参数
孤石
Shenzhen subway
shield construction
national high- way
settlement overrun
tunneling parameter
boulders