期刊文献+

岸桥调度的三维空间建模方法研究

Quay Crane Scheduling with a Three-dimensional Modeling Method
下载PDF
导出
摘要 岸桥是集装箱港口岸边作业的主要设备,岸桥调度的优劣将直接影响到船舶在港的装卸作业时间,进而对集装箱港口的总体作业效率产生影响.以时间序列、船舶舱位号,以及岸桥序号作为坐标轴建立正交三维空间,在该三维空间下可以建立岸桥调度的整数线性规划模型.利用该岸桥调度模型及LINGO软件对实际算例进行求解.结果表明,三维空间下建立的岸桥调度优化模型能够有效解决集装箱港口的岸桥调度问题. Quay cranes are the primary handling equipment on the wharf.The quay crane scheduling plan will affect the handling time of the arriving vessels directly,and the efficiency of the whole container port will be affected.A three-dimensional space was established in this paper.And an integer linear programing model was formulated.The model was solved with LINGO,and the experiment results showed that the model formulated with the three-dimensional method can be used to solve the quay crane scheduling problem very effectively.
出处 《武汉理工大学学报(交通科学与工程版)》 2014年第4期826-829,共4页 Journal of Wuhan University of Technology(Transportation Science & Engineering)
基金 国家自然科学基金青年基金项目资助(批准号:60904067)
关键词 集装箱港口 岸桥调度 三维空间 整数线性规划 LINGO container port quay crane scheduling 3-dimensional space integer linear programing LINGO
  • 相关文献

参考文献3

二级参考文献36

  • 1计明军,靳志宏.集装箱码头集卡与岸桥协调调度优化[J].复旦学报(自然科学版),2007,46(4):476-480. 被引量:47
  • 2曾庆成,高宇.集装箱码头装卸桥调度优化模型与算法[J].计算机工程与应用,2006,42(32):217-219. 被引量:16
  • 3Zhang H, Kim K H. Maximizing the number of dual- cycle operations of quay cranes in container terminals [J ]. Computers & Industrial Engineering Intelligent Manufacturing and Logistics, 2009, 56(3 ): 979- 992.
  • 4Meisel F, Wichmann M. Container sequencing for quay cranes with internal reshuffles [ J ]. OR Spectrum, 2010, 32(3): 569-591.
  • 5Meisel F, Bierwirth C. A unified approach for the evaluation of quay crane scheduling models and algorithms [ J ]. Computers & Operations Research,2011, 38(3): 683-693.
  • 6Tavakkoli-Moghaddam R, Makui A, Salahi S, et al. An efficient algorithm for solving a new mathematical model for a quay crane scheduling problem in container ports [ J ]. Computers & Industrial Engineering, 2009, 56 (1): 241-248.
  • 7Daganzo C F. The Crane Scheduling Problem[J]. Transportation Research B, 1989,23(3) = 159-175.
  • 8Bierwirth C, Meisel F. A Survey of Berth Allocation and Quay Crane Scheduling Problems in Container Terminals[R]. Halle-Wittenberg: Martin-Luther-University, 2009.
  • 9Winter T. Online and Real-time Dispatching Problems[D]. [S. 1. ]. Technical University Braunschweig, 1999.
  • 10Lim A, Rodrigues B, Xiao F, et al. Crane Scheduling with Spatial Constraints[J]. Naval Research Logistics, 2004, 51(3) ..386 406.

共引文献21

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部