期刊文献+

跨铁路特大桥防护棚架设计及结构验算 被引量:3

Design and Structural Checking of Protective Scaffolding for Railway-Crossing Extra-Large Bridge
下载PDF
导出
摘要 为保证上跨施工过程中让高速列车在其下方安全通过,汾河特大桥采用了防护棚架的设计方案。以汾河特大桥连续刚构施工防护棚架设计为例,重点介绍了防护棚架结构稳定性验算过程。结果表明,防护棚架在竖向荷载作用下结构是安全的。 For ensuring the safe traveling of high-speed train in the construction process of overpassing construction, Fenhe River Extra-Large Bridge used the design plan of protective scaffolding. Taking the design of protective scaffolding in continuous rigid frame construction of Fenhe River extra-large bridge as an example, the paper focuses on the structural stability of the protective scaffolding checking process. The results show that protective scaffolding structure under the function of vertical load is safe.
作者 于博
出处 《交通标准化》 2014年第16期166-169,共4页 Communications Standardization
关键词 跨铁路 特大桥 上跨 防护棚架 连续刚构 竖向荷载 railway-crossing bridge super large bridge overpassing protective scaffolding continuousrigid frame vertical load
  • 相关文献

参考文献3

二级参考文献3

  • 1铁道部.新建时速300~500公里客运专线铁路设计暂行规定[Z].铁建设[2007]47号.
  • 2GB50017-2003钢结构设计规范[S].北京:科学出版社,2003.
  • 3JTG D60-2004公路桥涵设计通用规范[S].北京:人民交通出版社,2004.

共引文献11

同被引文献8

引证文献3

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部