为了优化施工进度,合理计算工程开工时间、完工周期等,需要严格计算网络图时间参数,网络图时间参数对于整个工程具有重要的意义,因此完善网络时间参数的识记工作是提高建筑工程效率的重要手段。本文以网络图时间参数的重要意义为阐述的切入点,分析网络图时间参数的内容,以及如何加深对网络图时间参数的识记经验。
In order to optimize the construction progress and reasonably calculate the starting time and completion time of the construction project, it is necessary to strictly calculate network planning time parameter. Network planning time parameter is of great importance for the whole project, thus improving the network time parameters of memorization work is an important means of improving the efficiency of construction projects. Taking the significance of network planning time parameters as the breakthrough point, this paper analyzes the contents of network planning time parameters, and how to deepen the memorization of network planning time parameters.
出处
《价值工程》
2014年第27期273-274,共2页
Value Engineering
关键词
施工组织
横道图
网络图
时间参数
construction organization
crossing figure
network planning
time parameter