摘要
针对钢—混凝土结合梁的特点,对钢—混凝土结合梁的施工工艺作了介绍,并对安装前准备、钢梁吊装架设、线形调整连接等施工环节进行了详细论述,以期取得最佳的施工效果,从而确保工程的质量。
According to the features of the steel-concrete composite girder,the paper introduces its construction craft,and indicates the preparation for installation,erection of steel beam hoisting,and geometric shape adjustment,so as to achieve the optimal construction effect and ensure the engineering quality.
出处
《山西建筑》
2014年第25期204-205,共2页
Shanxi Architecture
关键词
钢-混凝土结合梁
安装
桥面
施工
steel-concrete composite girder
installation
bridge floor
construction