摘要
对桥梁高墩施工常用的翻模、滑模、爬模施工技术特点作了介绍,鉴于爬模施工技术的优越性,着重对液压爬模施工技术进行了阐述,并指出液压爬模施工是一种比较高效、安全的高墩施工技术。
This paper introduced the common rollover,sliding mode,climbing form construction technology features of bridge high pier construction,in view of the superiority of climbing form construction technology,emphatically elaborated the hydraulic climbing form construction technology,and pointed out that the hydraulic climbing form was a efficient,security high pier construction technology.
出处
《山西建筑》
2014年第25期208-209,共2页
Shanxi Architecture
关键词
液压爬模
施工技术
桥梁
hydraulic climbing form
construction technology
bridge