伊泰兹水电站引水洞施工支洞堵头稳定性分析 被引量:1

Structure and stability analysis on construction adit plug for Itezhi-tezhi hydropower station
下载PDF
导出
摘要 赞比亚伊泰兹水电站引水洞施工支洞堵头设计主要采用了两种解析法进行计算分析,为确保安全,考虑到施工技术、封堵条件、堵头所在位置等的影响,采用可靠度理论对堵头长度进行了分析计算,同时采用了三维有限元方法对堵头变形、位移等进行了复核,最终确定了满足稳定要求的堵头设计长度。 Two analytical methods are mainly used in the plug design of The Itezhi-tezhi hydropower station construction adit and the length of play is calculated by the analytical methods. For ensuring the engineering safety,the deformation and displacement of the plug are analyzed by the three-dimensional finite element method after considering the impacts of construction technology,sealing conditions and plug’s location in the cross section. Based on the results of FEM,the length of plug which can meet the requirements of safety is finally determined.
出处 《山西建筑》 2014年第25期241-242,共2页 Shanxi Architecture
关键词 施工支洞 堵头 可靠度分析法 有限元法 稳定性分析 construction adit plug analytical methods FEM stability analysis
  • 相关文献

参考文献5

二级参考文献11

共引文献45

同被引文献7

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部