摘要 库什塔依水电站位于寒冷地区,沥青混凝土心墙施工期较短,为加快工程施工进度,提前发挥发电效益,对其沥青混凝土心墙冬季低温施工的配合比进行了试验研究,并通过模拟试验验证了-25℃低温条件下的施工工艺。主要包括确定适合冬季低温施工的配合比,冬季施工沥青混凝土的分离度、层间结合性能、压实效果、接合面渗透性及沥青混凝土的力学特性。试验成果表明,沥青混凝土的各项性能均满足设计要求。 Cush Kobita Bea Hydropower Station is located in cold region of Xinjiang ,which leaves shorter time for the construction of asphalt concrete core wall of the rolled earth-rock dam .In order to shorten the construction time and make it possible for the station to operate in advance ,the mix propotion of asphalt concrete core wall were studied for winter low temperature construction .The construction process were simulated at -25℃ to test for resolution ,performance between the layers ,compaction effect ,permeability of contact face and physical-mechanical properties of the asphalt concrete .The results indicate that the properties of the asphalt concrete can meet the design requirements .
作者 张庆春
出处 《水利与建筑工程学报》 2014年第4期137-142,共6页 Journal of Water Resources and Architectural Engineering
关键词 沥青混凝土心墙 冬季施工工艺 配合比试验 力学性能 asphalt concrete core wall winter construction mix proportion mechanical properties
  • 相关文献

参考文献5

  • 1西安理工大学.新疆伊犁库克苏河库什塔依水电站工程沥青混凝土心墙冬季施工可行性专题论证报告[R].西安:西安理工大学水工沥青防渗研究所,2009.
  • 2新疆维吾尔自治区新疆水利水电勘测设计研究院.库什塔依水电站工程可行性研究报告[R].乌鲁木齐:水利部新疆维吾尔自治区新疆水利水电勘测设计研究院,2010.
  • 3中华人民共和国国家发展和改革委员会.DL/T5362--2006.水工沥青混凝土试验规程[S].北京:中国电力出版社,2007.
  • 4中华人民共和国国家能源局.DL/T5411-2009.土石坝沥青混凝土面板和心墙设计规范[S].北京:中国电力出版社,2009.
  • 5西安理工大学.新疆伊犁库克苏河库什塔依水电站工程沥青混凝土心墙材料及配合比试验报告[R].西安:西安理工大学水工沥青防渗研究所,2010.