摘要 针对现有煤矿重大危险源风险评估方法的不足,结合风险特征的多维性,提出了包含风险因素重要度、风险发生可能性、风险后果3个参数的三维风险分析模型。在煤矿重大危险源影响因素相关研究的基础上,以3类危险源为理论基础,构建煤矿重大危险源风险分析层次结构模型。考虑风险影响因素难以精确量化的问题,采用模糊层次分析法确定各层指标权重,并以三角模糊数描述风险概率和风险后果。最后,以某煤矿顶板危险源为例,测试该方法的有效性和准确性。结果表明,相较于综合评价的二维风险模型而言,三维风险模型考虑了风险发生概率,使风险控制措施更具针对性。该方法有助于煤矿企业制定合理的重大危险源风险管理和控制措施。 To overcome the shortage of the current methods for as sessing the risks in mining production, this paper attempts to come up with a renovated method known as a 3-D risk assessment model by joining the multidimensional risk features in the given circumstances. The renovated model of ours includes three parameters risk index, risk likelihood and risk seriousness grade, which is formulated based on the more targeted risk control measures and the comparison of the twodimensional risk models while sufficiently predicting the risk probabilities and evaluating the analytic hierarchy process (AHP) to solve the decisionmaking problems in the mining conditions. We have introduced the constituent hierarchical model of factors affecting the hazard sources based on the relative study of the riskinvolving factors, such as the target layer, the rule layer, the factors layer, etc. All kinds of the uncertainties and subjectivities endowed with the risk factors taken into account of the risk assessment process, we have resolved to adopt the fuzzy theory to our method for it is fit for paneling the uncertain factors by using the riskinvolving indexes.The influential degree of the different factors can then be determined by the fuzzy hierarchical method, the probability with the conse quences of the risk also being described by a triangular fuzzy number. With the two methods above, it would be possible to analyze the haz ard risk of experts' semantic information. And, finally, an illustra tive example on the rooffalling hazards assessment of a certain coal is used to demonstrate the proposed model. In accordance with the cal culation results of the risk index weight, it can be predicted that the rooffalling hazards should be one of the three greatest influential fac tors likely to cause the mining risks, which is conformed to the rela tive reference. What is more, the said calculation results also indi cate the availability and applicability of the suggested threedimen sional risk model for risk assessment we have proposed. The renovat ed method we have proposed can also help the managers and engi neers of the coal mines to improve their mining control plan and for mulate management measures to get rid of the unexpected mining dis asters.
出处 《安全与环境学报》 CAS CSCD 北大核心 2014年第4期130-133,共4页 Journal of Safety and Environment
关键词 安全工程 风险分析 三角模糊数 模糊层次分析 三维风险模型 safety engineering risk analysis triangular fuzzy num-ber fuzzy analytical hierarchy process three-dimen-sional risk model
  • 相关文献

参考文献14

  • 1LI Xiangong(李贤功).Study on complex causing mechanism and man-agement & control of signifwant gas accidents of coal mines in China (中国煤矿重大瓦斯事故致因复杂性机理及其管控研究)[D].Xuzhou: China University of Mining and Technology, 2010.
  • 2DUZGUNA H S B, EINSTEINB H H. Assessment and management of roof fall risks in underground coal minesEJ]. Safety Science, 2004, 42 (1): 23-41.
  • 3LU Y, LI X. A study on a new hazard detecting and controlling method : the case of coal mining companies in China[J]. Safety Science, 2011, 49(2) : 279 - 285.
  • 4JIANG W, QU F, ZHANG L. Quantitative identification and analysis on hazard sources of roof fall accident in coal mine[J]. Procedia Engi- neering, 2012, 45(8): 83-88.
  • 5WANGTao(王焘).Study on risk assessment of coal working face based Ontheoryofh.azard(基于危险源理论的采煤工作面风险评价研究)[D].Xi' an : Xi' an University of Science and Technology, 2008.
  • 6CHENBin(陈斌).Research and application of risk assessment on the hazards in coal mine (煤矿危险源风险评价研究及应用)[D].xi’an: Xi' an University of Science and Technology, 2011.
  • 7ZENG J H, AN M, SIMTH N. Application of a fuzzy based decision making methodology to construction project risk assessment[ J ]. Interna- tional Journal of Project Management, 2007, 25(6): 589- 600.
  • 8CARR V, TAH J H M. A fuzzy approach to construction project risk as- sessment and analysis: construction project risk management system [ J ]. Advances in Engineering Software, 2001, 32(10) : 847 - 857.
  • 9于观华,田水承,王莉,杨庆威.基于三类危险源的掘进工作面瓦斯爆炸模糊综合安全评价[J].矿业安全与环保,2013,40(1):111-114. 被引量:13
  • 10朱松岭,周平,韩毅,杨海成.基于模糊层次分析法的风险量化研究[J].计算机集成制造系统,2004,10(8):980-984. 被引量:81

二级参考文献32

共引文献97

同被引文献37

引证文献4

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部