亭子口水电站厂房清水混凝土施工工艺的研究与应用 被引量:6

Research and Application of Fair-faced Concrete Construction Technology for the Powerhouse of Tingzikou Hydropower Station
下载PDF
导出
摘要 依托亭子口水电站厂房混凝土施工项目,通过采用合理的模板选型布置、混凝土配合比、混凝土入仓手段、混凝土施工仓面设计、混凝土浇筑过程控制、混凝土养护等措施,进行了混凝土施工过程中施工质量、机械操作、作业效率、测量监控、施工成本、环保等方面的对比、分析,重点研究并提出了合理的清水混凝土施工工艺、技术参数、质量控制等技术要点。 Based on the concrete construction of powerhouse of Tingzikou Hydropower Station, the concrete construction quality, mechanical operation, working efficiency, measuring and monitoring, construction cost and environmental protection are compared and analyzed by adopting reasonable formwork selection and layout, concrete mix proportion, concrete transport mean, placement process design, placement process control and concrete curing. The reasonable fair-faced concrete construction technology, technical parameters and quality controls are studied and proposed.
出处 《水力发电》 北大核心 2014年第9期35-37,74,共4页 Water Power
关键词 清水混凝土 施工工艺 研究与应用 厂房 亭子口水利枢纽 fair-faced concrete construction technology research and application powerhouse Tingzikou Water Control Project
  • 相关文献

参考文献3

二级参考文献5

  • 1JGJ160-2009 清水混凝土应用技术规程[S].
  • 2SL52-1993 水利水电施工测量规范[S].
  • 3DL/T5144-2001.水工混凝土施工规范[S].[S].,..
  • 4DL/T5110-2000.水利水电工程模板施工规范[S].[S].,..
  • 5DL/T 5169-2002,水工混凝土钢筋施工规范[S].

共引文献15

同被引文献37

引证文献6

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部