PPP项目残值风险系统性影响因素识别及分析 被引量:11

Identification and Analysis of Systematic Influencing Factors of Residual Value Risk for PPP Projects
下载PDF
导出
摘要 探讨了PPP(Public-Private-Partnership)项目残值风险系统性影响因素的识别和应对措施问题。介绍了PPP项目残值和残值风险理论,指出系统性影响因素对PPP项目残值和残值风险管理的重要性。通过文献研读、案例总结识别出12个系统性影响因素风险指标,并对其进行了问卷调查。对问卷调查所得数据进行了效度和信度检验、描述性统计分析和因子分析,提取4个主成分因子。在此基础上提出了风险应对措施和风险管理意见。 This article discusses the identification and management measures of systematic influencing factors of residual value risk for Public-Private-Partnership(PPP)Projects. Firstly,residual value and residual value risk(RVR)theory is introduced and the importance of systematic influencing factors to management of RVR is pointed out. Then,twelve systematic influencing factors is identified through literature review and cases study. After that,the questionnaire survey about these twelve factors is conducted. What’s more,the validity and reliability test,descriptive statistical analysis and factor analysis of the data collected from questionnaire survey are also processed and four main composition factors are extracted. Lastly,suggestions about risk response and risk management are put forward based on the results of questionnaire survey.
出处 《工程管理学报》 2014年第4期77-81,共5页 Journal of Engineering Management
基金 国家自然科学基金青年科学基金项目(71001027)
关键词 PPP项目 残值风险 系统性影响因素 风险识别 因子分析 PPP projects residual value risk systematic influencing factors risk identification factor analysis
  • 相关文献

参考文献19

  • 1王灏.PPP的定义和分类研究[J].都市快轨交通,2004,17(5):23-27. 被引量:186
  • 2Jui-Sheng Chou, H. Ping Tserng, Chieh Lin, et al. Critical factors and risk allocation for PPP policy: Comparison between HSR and general infrastructure projects[J]. Transport Policy. 2012, 22: 36-48.
  • 3Wei Xiong, Xueqing Zhang. Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate[M]. German: Springer Berlin Heidelberg, 2014.
  • 4Xiao-Hua Jin, Guomin Zhang. Modelling optimal risk allocation in PPP projects using artificial neural networks[J]. International Journal of Project Management, 2011, 29 (5): 591-603.
  • 5Partnerships Victoria( 2008 )Risk allocation and contractual issues[EB/OL]. Available from http: //www.partnerships.vic. gov.au.
  • 6Hall J. Private opportunity, public benefit[J]. Fiscal Studies, 1998, 19 (2): 121-140.
  • 7张文彤,董伟.SPSS统计分析高级教程[M].北京:高等教育出版社,2007,54-65.
  • 8熊伟.特许经营期末PPP项目残值风险评估研究[D].南京:东南大学,2011.
  • 9李荣平,袁竞峰,张星,李启明.PPP项目残值风险路径及其脆弱性研究[J].项目管理技术,2011,9(10):30-34. 被引量:12
  • 10Noble, G., and Jones, R. The Role of Boundary-spanning Managers in the Establishment of Partnerships (4) [J]. Public Administration, 2006, 84 (4): 891-917.

二级参考文献22

  • 1张宏亮,李鹏.PFI项目特点对项目风险事件和脆弱性的影响[J].管理工程学报,2007,21(1):102-109. 被引量:6
  • 2邓小鹏.PPP项目的风险分担研究.南京:东南大学博士学位论文,2007.
  • 3L. Y. Shen, h. Platten and X. P. Deng. Role of public private partnerships to manage risks in public sector projects in Hong Kong.International Journal of Project Management, 2006, (24):587-594.
  • 4S. Q. Wang, R.L.L Tiong, S. K. Ting and D. Ashley. Evaluation and Management of Political Risks in China's BOT Projects. Journal of Construction Engineering and Management, 2000, 126(3):242-250.
  • 5J. F. Yuan, X. P. Deng, and Q. M. Li. Analysis on application of PPP method in China Problem Review and Case Study. Proceed- ings of International Conference on Construction and Real Estate Management, 2007,(1):307-312.
  • 6B. Li, A. hkintoye, P. J. Edwards, and C. Hardcastle. Critical success factors for PPP/ PFI projects in the UK construction industry.Construction Management and Economics, 2005, (23): ,159-471.
  • 7Akintoye, C. Hardcastle, M. Beck, E. Chinyio, and A. D. Darinka. Achieving best value in private finance initiative project procurement. Construction Management and Economics, 2003, (21): 461-470.
  • 8Cutter S L. Living with risk: the geography of technological hazards [ M]. London: Edward Arnold, 1993.
  • 9Timmerman P. Vulnerability, resilience and the collapse of society : a review of models and possible climatic applications [ M]. Toronto: Institute for Environmental Studies, 1981.
  • 10Al-Bahar J F, Keith C Crandall. Systematic risk management approach for construction projects [ J ]. Journal of Construction Engineering and Management, 1990, 116 (3): 533-546.

共引文献265

同被引文献57

引证文献11

二级引证文献69

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部