摘要
以普光气田开发为例,对高含硫气田的监护力量配置现状进行了分析,为下一步高含硫气田监护力量配置提出建议。
By taking development of Pugting GasField for example, the stalus of monitoring strength configuration of high sulphur-eontaining gas field is analyzed to provide suggestions for monitoring strength configuration for the high sulfurcontaining gas field at the next step.
出处
《安全、健康和环境》
2014年第8期37-39,共3页
Safety Health & Environment
关键词
高含硫气田
监护
应急救援
high sulfur-containing: monitoring: emergency rescue