某斜拉桥主梁施工预拱度的设置及主梁线形控制 被引量:3

Construction Camber Setting and Girder's Linear Control of a Cable Stayed Bridge
下载PDF
导出
摘要 以新密市溱水路斜拉桥为工程实例,通过建立有限元模型,进行主梁支架施工预拱度的数值模拟和理论分析。结果表明:预拱度计算值与实测值的误差较小,且按此预拱度施工,主梁线形合理,工程效果良好,对类似桥梁预拱度的设计以及施工监测具有一定的指导意义。 The construction camber setting and the girder's liner control of a cable stayed bridge have been studied. Based on the cable stayed bridge on Zhenshui Road in Xinmi City, the numerical simulation and theoretical analysis of the girder bracket construction camber have been carried out through setting up finite element model. Results show that error between the calculated values and the measured ones of camber is small, and construction based on this camber will have reasonable linear girder so as to obtain desirable engineering effects, which will offer some guidance to the design and construction monitoring of bridge camber of similar kind.
出处 《洛阳理工学院学报(自然科学版)》 2014年第2期14-19,共6页 Journal of Luoyang Institute of Science and Technology:Natural Science Edition
基金 河南省重点科技攻关项目(082102230026)
关键词 斜拉桥 支架预压 施工预拱度 主梁线形控制 cable stayed bridge bracket prepressing construction camber linear control of main girder
  • 相关文献

参考文献6

二级参考文献43

共引文献115

同被引文献16

引证文献3

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部