摘要
随着水资源环境的日益恶化,污水处理行业逐渐被人们所重视。而污泥脱水作为污水处理中至关重要的环节,它的好坏往往决定着污水处理的效果。一般工艺设计和实际运行存在某些不合理的环节,需要通过实际操作加以改善,从而降低处理成本和能耗。
With the deterioration of water environment, the sewage treatment industry has attracted more attention. As the important step in sewage treatment, the sludge dewatering determined the effect of the whole treatment process. Some unreasonable points in the general design and actual operation of sludge dewatering need to be improved. The factory modified some sections in order to achieve the ideal effect of sludge dewatering based upon the experience of actual operation in recent years, so as to reduce the Drocessino cost and energy consumption.
出处
《再生资源与循环经济》
2014年第8期31-32,44,共3页
Recyclable Resources and Circular Economy
关键词
污泥脱水
离心脱水
絮凝时间
sludge dewatering
centrifuge
flocculation time