摘要
本文简要地介绍了取水枢纽布局及防草防砂措施,输水暗渠、水工艺流程、主要净化构筑物选择及设计参数等内容。
This article presents the process design of the Waterworks No. 6 of Chengdu, recommending the process of water intake and prevention method against grass and sand from river water,design of covered water delivering channel,process of water treatment,choice of main water treatment structure,and design parameters.
出处
《中国给水排水》
CAS
CSCD
北大核心
1991年第1期21-24,共4页
China Water & Wastewater