期刊文献+

对水平井ZBX井修正等时试井设计的反思 被引量:1

Rethink on the Design of Modified Isochronal Test for ZBX Horizontal Well
下载PDF
导出
摘要 开关井制度是试井设计的核心内容,对于修正等时试井,如何确定开井期间油嘴的大小,在测试现场大多是靠经验设定,常常造成测试失败或增大解释结果的误差。以ZBX水平井为例,讨论了如何选择测试时油嘴大小,以及施工过程中需要考虑的相关因素,认为等时试井之间需要较长时间的开井,以便洗干净整个井筒;对于低渗产能较低气井,测试时油嘴应由小到大。 Open /shut in schedule is the core content of the well test design. For the modified isochronal test,how to determine the scale of the choke during opening of the well is usually set up by experience,that e often induces the failure of test or increasing larger errors. ZBX horizontal well is taken as an example to discuss how to choose the choke sizes and what factors should be considered in the test operation. It will provide references to design well test program for the similar horizontal wells.
出处 《油气井测试》 2014年第4期22-23,76,共2页 Well Testing
关键词 水平井 修正等时试井 设计 生产制度 horizontal well,modified isochronal test,design,production system
  • 相关文献

参考文献4

二级参考文献1

共引文献15

同被引文献2

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部