摘要
巴基斯坦Karot水电站工程骨料场储量勘测精准度,直接影响工程建设的投资决策。项目部成立QC小组,改进原勘测技术,减少计算误差,为工程设计提供了精确数据。小组对攻关成果进行标准化管理,重新修订"基于CATIA V5的三维地质料场建模技术"并通过专家评审,从而保证了类似工程料场的勘测计算精度。
Aggregate quarry reserves survey accuracy of Pakistan Karot Hydropower Station Project directly affects investment decisions of construction projects. Project department established QC team for improving original investigation techniques, reducing calculation error, and providing accurate data for project design. The team conducts standard management on tackling results. ' CATIA VS-based Three-dimensional Geological Quarry Modeling Technique' is revised and approved by experts, thereby ensuring investigation and calculation accuracy of similar project quarry.
出处
《水利建设与管理》
2014年第8期70-74,共5页
Water Conservancy Construction and Management
关键词
料场储量
三维建模
计算误差率
quarry reserves
three-dimensional modeling
calculation error rate