期刊文献+

山西磨河水电站坝基工程地质问题研究 被引量:4

Study on Dam Foundation Project Geological Problems in Shanxi Mohe Hydropower Station
下载PDF
导出
摘要 山西磨河水电站坝基地层多为第四系松散层,主要为混合土漂(卵)石,少量的粉土质砂和低液限粉土,结构松散,分选较差,力学强度低,透水性大。本文针对磨河水电站存在的坝基松散层渗漏、渗透变形、坝基基坑涌水、基岩渗漏和左右坝肩绕坝渗漏等问题,研究提出处理问题的措施和对策,对高山峡谷区坝基处理提供指导性建议。 Shanxi Mohe Hydropower Station dam foundation strata are mostly quaternary loose beds,which are mainly composed of mixed soil boulders (gravels),a small amount of silty sand and silt with low liquid limit.The strata are characterized by loose structure,poor sorting,low mechanical strength and high water permeability.In the paper,solutions and countermeasures are proposed by studying aiming at problems in Mohe Hydropower Station,such as dam foundation seepage in loose beds,penetration deformation,dam foundation excavation gushing,bedrock leakage and leakage around the dam in left and right abutments.Guidance suggestions are provided aiming at dam foundation treatment in areas with mountains and canyons.
作者 王瑞民
出处 《中国水能及电气化》 2014年第8期54-57,共4页 China Water Power & Electrification
关键词 坝基 松散层渗漏 渗透变形 基坑涌水 基岩渗漏 dam foundation loose bed leakage penetration deformation foundation pit gushing bedrock leakage
  • 相关文献

参考文献4

共引文献5

同被引文献19

引证文献4

二级引证文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部