期刊文献+

两河口水电站心墙堆石坝防渗心墙料的研究 被引量:3

Research of Core Wall Rock-fill Dam Anti-seepage Core Wall Materials in Lianghekou Hydropower Station
下载PDF
导出
摘要 两河口水电站工程堆石坝坝高295m,砾石土心墙料429万m3。由于该工程堆石坝高达300m级,国内尚无建设的成功经验,而且防渗土料分布较广,料源复杂。本文通过对防渗心墙的研究,论证了其合理性和可靠性,为同类型大坝心墙料的研究提供参考。 Rock fill dam of Lianghekou Hydropower Station Project is as high as 295 m.Gravel soil core wall material of 4.29 million m3 is adopted.Since the rock fill dam in the project reaches 300m grade,there is no successful construction experience in China.Besides,impervious soil materials are widely distributed,and material sources are complex.The reasonability and reliability of the core wall are discussed through studying anti seepage core wall,thereby providing reference for studying similar dam cor wall materials.
作者 欧阳学金
出处 《中国水能及电气化》 2014年第8期67-70,共4页 China Water Power & Electrification
关键词 心墙堆石坝 防渗心墙料 研究 rock-fill dam ant-seepage core wall material study
  • 相关文献

参考文献3

二级参考文献6

  • 1李朝政,李伟,等.苗尾水电站可行性研究阶段大坝心墙防渗土料现场碾压试验报告[R].昆明:中国水电顾问集团昆明勘测设计研究院科学研究分院,2010:1-14.
  • 2中华人民共和国国家国家经济贸易委员会.DL/T5129-2001.碾压式土石坝施工规范[s].北京:中国电力出版社,2001:61-65.
  • 3中华人民共和国水利部.SL/237-1999.土工试验规程[s].北京:中国水利水电出版社,1999:425-426.
  • 4中华人民共和国国家发展和改革委员会.DIJT5395-2007.碾压式土石坝设计规范[s].北京:中国电力出版社,2008:18-20.
  • 5赵川,刘盛乾,李锡林,吴敏,沈嗣元,李小联,谷涛,张世红.糯扎渡水电站粘土心墙压实度检测方法及控制标准[J].云南水力发电,2009,25(5):58-61. 被引量:14
  • 6李朝政,李伟,陈江.苗尾水电站心墙防渗土料压实质量检测方法及控制标准[J].水力发电,2011,37(10):51-53. 被引量:5

共引文献26

同被引文献14

引证文献3

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部