摘要
以运城华源街大桥桩基施工为例,通过对桩基施工的各环节监理,分析了影响桩基施工的主要因素,提出了各阶段的施工控制重点及监理工作要点,以保证桩基施工质量。
Taking Huayuan street bridge pile foundation construction of Yuncheng city as an example,the article analyzes factors influencing pile foundation construction through supervising pile construction,and puts forward construction control points and supervision points at various pha-ses,with a view to guarantee pile foundation construction quality.
出处
《山西建筑》
2014年第26期226-227,共2页
Shanxi Architecture
关键词
桩基
质量控制要点
混凝土灌注
检测
pile foundation quality control point concrete pouring examination