期刊文献+

口腔综合治疗台安装的管路设计 被引量:1

Pre-installation pipeline design of comprehensive dental treatment unit
下载PDF
导出
摘要 目的:为了便于口腔综合治疗台安装完成后的维护,在安装前对其管路进行设计。方法:对口腔综合治疗台的安装位置、正压管路、集中供排水、负压吸引、电源线路5个方面进行设计。结果:按照该设计方法进行的管路安装,设备运行平稳、使用正常、后期维护方便。结论:良好的管路设计可使口腔综合治疗台安装顺利,使医生的诊疗工作得心应手,也方便今后的维护、检修和更新。 Objective To design the pipeline before installation in order to facilitate the maintenance of the comprehensive dental treatment unit. Methods The design was performed from the aspects of position, positive-pressure pipeline, centralized water supply and drainage, negative-pressure suction and power source circuit. Results The design contributed to the operation and maintenance of the unit. Conclusion The pipeline design facilitates the installation, maintenance, repairing and renewal of the comprehensive dental treatment unit.
出处 《医疗卫生装备》 CAS 2014年第8期46-47,71,共3页 Chinese Medical Equipment Journal
关键词 口腔综合治疗台 管路设计 正压管路 负压吸引 comprehensive dental treatment unit pipeline design positive-pressure pipeline negative-pressure suction
  • 相关文献

参考文献5

二级参考文献11

共引文献22

同被引文献4

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部