摘要
BT模式通过引入国内外社会资金来对基础设施进行投资建设,极大缓解了政府的财政压力,因此得到广泛的应用和推行。但是由于BT模式没有运营期,回购总价由建设成本和投资费用两部分组成,若建设投资失控必然会造成回购总价偏高,从而产生回购风险。从制度层面进行项目的投资控制研究,引入公共项目治理理论,在总结深圳地铁M号线实施情况的基础上,运用扎根理论的研究方法识别出项目治理层投资控制的核心要点为项目控制权配置、合同中的风险分担和回购总价的控制,然后对核心要点进行详细分析,为实现政府的有效投资控制以及BT模式在城市轨道交通领域更好地推广应用提供建议。
BT-Mode makes the investment and construction in infrastructure by introducing the social capital at home and abroad,greatly reducing the financial pressure of government.Therefore it has been widely used.But because of BT-Mode without operation period,the repurchase price consists of construction cost and investment cost.If the construction investment is out of control,it is inevitable that the repurchase price is on the high side,resulting in a risk of repurchase. Therefore,this paper makes an investment control study of BT-Mode from the system level by introducing the project gov-ernance theory.On the basis of summarizing the implementation of Shenzhen Metro Line M,this paper adopts the grounded theory research methods and identifies three core elements of investment control on project contractor level,then analyzes the core elements.The three core elements include project control right allocation,risk ! sharing in the contract and con-trol of repurchase total price.Research results can provide suggestions for government to implement the effective investment control and apply BT-Mode in urban rail transit.
出处
《科技管理研究》
CSSCI
北大核心
2014年第16期223-228,248,共7页
Science and Technology Management Research
基金
国家自然科学基金项目"公共项目治理绩效度量研究:基于契约治理与关系治理的视角"(71272017)
教育部人文社科基金项目"政府投资项目集中代建机构组织绩效改善研究"(12YJC630258)