摘要
因管网来水水质、水量波动大,给工业园区污水处理厂的工艺调试带来了一定的难度。文章从物化工艺、厌氧工艺及好氧工艺调试的角度,分别论述了其在工艺调试过程中的注意事项。此外,论文指出,严格控制管网进水水质是保障工业园区污水处理厂工艺调试顺利进行的前提条件,同时列举了严控进水水质可采取的相关措施。
Due to large fluctuations of water quality and quantity from the pipe network, there is a certain difficulty during process debugging in the industrial Park sewage treatment plant. From the perspective of physical and chemical process and anaerobic process and aerobic process, considerations of process debugging are discussed. In addition the paper points out that strict control of pipeline influent water quality is a prerequisite for process debugging in the industrial Park sewage treatment plant, in the meantime related measures of strict control in connection with pipeline influent water quality are listed.
出处
《广东化工》
CAS
2014年第15期183-184,174,共3页
Guangdong Chemical Industry
关键词
工业园区污水处理厂
工艺调试
注意事项
the industrial Park sewage treatment plant
process debugging
considerations