摘要
结合工程实例,通过对牛寨节制闸综合式消力池及无辅助消能设施的综合式对比计算分析,证明了辅助消能设施对于减小消力池深度和长度的有效性,总结了消能计算成果的一般规律及综合式消力池消力坎的高度和消力池深度在整个消能过程中的相互转换关系。
Combined with the engineering example, the effectiveness of the auxiliary energy dissipation facilities for reducing the depth and length of stilling basin is proved by comparing the Niuzhai Regulater comprehensive stilling basin with auxiliary energy dissipation facilities and without them. The general rule of the energy dissipation calculation and the conversion relationships between the depth of stilling basin and' the height of ridge are summarized.