对云南某矿新增选矿能力技改方案的研究及探讨

Research and Discussion on Technical Schemes of New Processing Capacity for A Copper Mine in Yunnan Province
下载PDF
导出
摘要 云南某矿为铜锌多金属露天开采矿山,存在采矿能力高于选矿能力从而制约企业安全生产和持续发展的问题。结合矿山规划围绕增加选矿产能开展了四选厂技改和三选厂技改两个方案的研究,得出了两个方案技术上均可行,三选厂技改方案在投资、建设周期方面优于四选厂技改方案的结论,为企业管理决策提供了科学的依据和技术支持。 The problem of a copper zinc polymetallic open pit mine in Yunnan is that its mining capacity is much higher than processing capacity,which restricts the safety production and the sustainable development of the enterprise.Based on the mine plan and with the concentration on increasing processing capacity,two schemes were worked out on the technical transformation of plant IV and plant III.It turned out that both schemes are technically feasible while the plant III was better in investment and construction period than that of plant IV,which provides the scientific basis and technical support for enterprise management decision.
作者 王春 朱艳芬
出处 《湖南有色金属》 CAS 2014年第4期16-18,67,共4页 Hunan Nonferrous Metals
关键词 采选能力 提高选矿产能 技术改造 方案研究 mining capacity improve processing capacity technological transformation scheme research
  • 相关文献

参考文献2

  • 1昆明有色冶金设计研究院股份公司.云南某矿三选厂新增1 500 t/d选矿能力技改工程可行性研究报告[R].昆明:昆明有色冶金设计研究院股份公司,2014.
  • 2昆明有色冶金设计研究院股份公司.云南某矿四选厂新增2000 t/d选矿能力技改工程可行性研究报告[R].昆明:昆明有色冶金设计研究院股份公司,2013.