多阶段人机协同的炼钢—连铸调度方法 被引量:3

Multi-stage man-machine cooperated scheduling method for steelmaking &continuous casting
下载PDF
导出
摘要 针对现有调度方法的不足,提出一种新的多阶段人机协同调度方法。该方法首先建立了调度模型和多阶段人机协同调度结构;综合采用贪心与反贪心算法、邻域搜索算法进行优化;利用约束联动方法满足约束,从而使调度经验融入优化过程。通过实例和算法性能测试,证明了该方法可以更好地结合调度经验,并具有较好的计算效率。 Aiming at the shortage of existing scheduling method, a new Multi-Stage Man-Machine Cooperated sched- uling method (MSMMC) was presented. The scheduling model and scheduling structure of MSMMC were built, and the greedy algorithm, reversed greedy algorithm and neighborhood search algorithm were applied to optimize them. The group adjustment method was used to satisfy the constraints, thus the scheduling experience could be integrated into optimization process. A scheduling example showed that MSMMC could amplify the advantage of human experience, and the performance testing showed that MSMMC had good computational efficiency.
出处 《计算机集成制造系统》 EI CSCD 北大核心 2014年第7期1675-1683,共9页 Computer Integrated Manufacturing Systems
基金 国家自然科学基金资助项目(71301008) 北京市自然科学基金资助项目(9144030) 北京市青年英才计划资助项目(YETP0361)~~
关键词 人机协同 关键路径 邻域搜索 炼钢—连铸 调度 man machine cooperated critical path neighborhood search steelmaking and continuous casting scheduling
  • 相关文献

参考文献15

  • 1王柏琳,李铁克,张春生,张文学,孙彬.基于动态约束满足的考虑连铸机故障的炼钢连铸调度算法[J].计算机集成制造系统,2011,17(10):2185-2194. 被引量:21
  • 2PACCIARELLI D,PRANZO M.Production scheduling in a steelmaking-continuous casting plant[J].Computers and Chemical Engineering,2004,18 (12):2823-2835.
  • 3NAPHADE K S,WU S D,STORER R H,et al.Melt seheduling to trade off material waste and shipping Performance[J].Operations Research,2001,49(5):629-645.
  • 4轩华.含串行批处理机的三阶段混合流水车间调度问题[J].计算机集成制造系统,2012,18(5):1006-1010. 被引量:7
  • 5PAN Quanke,WANG Ling,MAO Kun.An effective artificial bee colony algorithm for a real-world hybrid flowshop problem in steelmaking process[J].IEEE Transactions on Automation Science and Engineering,2013,10(2):307-322.
  • 6SANTOS C A,SPIM J A,GARCIA A.Mathematical modeling and optimization strategies (genetic algorithm and knowledge base) applied to the continuous casting of steel[J].Engineering Applications of artificial Intelligence,2003,16 (6):511-527.
  • 7TANG Lixin,WANG Xianpeng.An improved particle swarm optimization algorithm for the hybrid flowshop scheduling to minimize total weighted completion time in process industry[J].IEEE Transactions on Control Systems Technology,2010,18(6):1303-1314.
  • 8DONG Hongyu,HUANG Min.Improved varible neighborhood search for integrated tundish planning in steelmaking process[J].International Journal of Production Research,2012,50(20):5747-5761.
  • 9CHEN Kai,ZHENG Zhong,GAO Xiaoqiang.Computer-aided planning and scheduling system for steelmaking-continuous casting[J].Journal of Iron and Steel Research International,2010,17(2):29-34.
  • 10俞胜平,陈文明,庞新富,柴天佑,郑秉霖.基于图形化编辑平台的炼钢连铸动态调度仿真系统[J].系统仿真学报,2009,21(16):5145-5149. 被引量:12

二级参考文献78

共引文献60

同被引文献29

引证文献3

二级引证文献12

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部